Fire Safety Engineering Bulletins
Fire Inspectors Area Guide
Date
Bulletin Topic
Related Attachments
---
Jul 11
Flexible Piping Calcs
May 11
Apr 11
Inspection, Testing & Maintenance Forms
Forms Webpage
Mar 11
Hydraulic Reference Point Symbol
Hexagon
Permit Application via Fax Procedure
Feb 11
CPVC - 1' Clearance Revisited
Installation Requirements for CPVC
Feb 09
Residential Backflow Prevention
atch a: NAC 445A
atch b: UPC 603
Residential PRVs
Dec 08
Fire Alarm Submittals
2009 IFC Section 907.1.2
Oct 08
Flexible Pipe Drops for Shell Buildings
Sep 08
REMINDER - NICET Wet Signature
Jul 08
May 08
Light Bulb Temperatures
Aug 07
CPVC "Tee-Runs"
Jun 07
1-4 Devices Revised
Alarm/Sprinkler Monitoring Flow Chart
Feb 07
Jan 07
Aug 06
May 06
Jan 06
Fire Safety Inspections-
Next Day & Same Day Service
Overtime Request Form
Nov 05
Oct 05
Sep 05
09-12-05 Memo
Aug 05
Reduced Pressure Principle Assembly (RPPA) Devices No Longer Required for Antifreeze Systems
Jun 05
May 05
Jan 05
Top 10 common Errors on Sprinkler Drawings - Part 2
Top 10 Common Errors on Sprinkler Drawings - Part 1
Sep 04
Fire Sprinkler Pump Testing Criteria